top of page

Efficient and Reliable Underground Chilled Water Pipeline Installation: The NIRON All PRO Solution

Writer's picture: Abby ZiuAbby Ziu

Updated: Dec 6, 2024

In today's construction landscape, selecting the right materials can significantly shape the success of a project. A prime example of this occurred during the underground installation of an 18-inch chilled water pipeline for a government building in Las Vegas, Nevada. The project leveraged the advanced NIRON All PRO preinsulated pipes and fittings, known for their outstanding performance and durability.


Understanding the Benefits of NIRON All PRO


The NIRON All PRO system is tailored for chilled water applications, ensuring consistent temperature control throughout the pipeline. One of the key benefits is its preinsulated design, which enhances energy savings by cutting thermal losses by up to 95%. This feature proves crucial in high-temperature areas like Las Vegas, where maintaining chilled water efficiency is vital for climate control.




28 views0 comments

Comments


bottom of page